The equipment adopts high temperature and high pressure drying process, using steam as the heat source, heating in the compartment, first using high temperature and high pressure to kill all pathogens in the animal body, and then using low temperature vacuum drying treatment, and finally get meat and bone meal dry products, feather meal and animal oil.

Product Image 1
Product Image 2
Product Image 3
Product Image 4
High Temperature Sterilization and Drying Process Flow Chart
Process Flow Chart
Processing Steps
1

Closed Transport

The closed turnover box is used for the transportation of animal carcasses to prevent the spread of pathogens. It is easy to load and unload, avoiding direct contact with diseased animals.

2

Centralized Treatment Plant

Timely treatment of animal carcasses directly into pre-crushing equipment. Temporary storage is available in cold storage areas for processing queues.

3

Vehicle Disinfection

After unloading, transport vehicles and containers enter the disinfection channel for thorough cleaning.

4

Crushing Equipment

Carcasses of sick animals and poultry are pre-broken by a special crusher for further processing.

5

High-temperature Processing & Drying

Broken carcasses are transported to the chemical tank via a vacuum feed pump for autoclave treatment.

6

Material Drying Treatment

After sterilization, materials are sent to the dryer for final high-temperature drying.

7

Material Storage Warehouse

Temporary storage area for the dried final materials.

8

Oil Press

Degreases the dried material to reduce residual oil and moisture, improving product value and storage life.

9

Heated Oil Storage Tank

Stores oil with an internal heating system to prevent solidification.

10

Cyclone Precipitator

Filters material residue from the exhaust gas before discharge.

11

Tubular Condenser

Cools high-temperature exhaust gas to reduce odor diffusion.

12

Spray Tower

Preliminary acid-alkali washing of waste gas.

13

Electrical Control Cabinet

Automated computer control for all motors and wiring of the processing equipment.

Actual Case & Capacity
Case 1
Case 2
Capacity 5T

Processing Capacity: 5 tons/time
Daily Capacity: 30 tons/day

Capacity 3T

Processing Capacity: 3 tons/time
Daily Capacity: 15 tons/day

Capacity 10T

Processing Capacity: 10 tons/time
Daily Capacity: 30-40 tons/day

Capacity 20T

Processing Capacity: 20 tons/time | Daily Capacity: 40 tons/day

Technical Specifications
Parameters Standard Value Options
Tank size (mm)φ1600/1800x4500Customizable
Effective volume (m³)9.6Customizable
Work pressure (Mpa)0.25-0.4-
Working temperature (°C)120-140-
Processing capacity (T)8.0Customizable
Power (kW)45Customizable
Related Products
Facilities & Production
Frequently Asked Questions
What are the payment terms?
T/T, L/C and trade assurance are acceptable. T/T is preferred: 30% deposit before production, and 70% balance before shipment.
What is the expected delivery time?
For most machines, the delivery time is at least 2 months after receiving the deposit.
How is the equipment packaged for shipping?
We use standard export packaging to ensure the safety of the machines during transit.
Do you provide installation support at the destination?
Yes, our engineers can visit the customer's site for installation if required. This service is provided based on the terms specified in the contract.
Do you support custom equipment configurations?
Absolutely. We customize the production capacity and machine specifications according to specific customer requirements.
How do you handle different processing capacities?
We design and produce equipment that caters to any capacity needs, from small-scale 3-ton units to large 20-ton industrial systems.

Related Products