| STRUCTURE AND CLADDING | INTERIOR DECORATION | ||
|---|---|---|---|
| Area | Content | Area | Content |
| Steel Structure | Hot-dip Galvanized Steel | Interior Wall | WPC (Wood Plastic Composite) |
| Enclosure | Aluminum Alloy | Floor | SPC (Stone Plastic Composite) |
| Exterior Surface | Powder Coating | Bathroom+Plumbing | Bathroom Pod +Plumbing |
| Insulation | Fire Retardant Insulation Foam | Lighting | LED Lighting System |
| Glass | Low-E Double Glazing (Toughened) | Eletrical | Electrical System |
| Door | Low-E Double Glazing Hinged Door(Toughened) With Smart Lock | Curtain Rail | Only curtain rail, curtain is not included |
A: T/T and letter of credit are acceptable, and we will be even more grateful to T/T. 30% deposit before production and 70% balance before T/T loading.
A: This depends on the order quantity. Generally speaking, the delivery time will be within 15 to 30 days.
A: Ocean container loading.
A: We will provide you with installation instructions and videos, and if necessary, we will send technical personnel to assist you. However, visa fees, airfare, accommodation, and wages will be provided by the buyer.
A: Strict product quality control enables quality to achieve the future. This is the purpose of our factory. Every product in our factory has strict testing procedures and must achieve 100% quality before delivery.
A: Not at all. As long as you can use electric tools, you can build a house independently according to the construction drawings.