| Product name | Steel structure building |
|---|---|
| Main materials | Q355B Welded H-beam and column (equivalent to S355JR, ASTM A572 Gr. 50) Q235B (equivalent to S235JR, ASTM A36) |
| Surface | Painting Or Galvanizing |
| Roof & wall panel | Single steel sheet & Insulation sandwich panels(PU, rock wool and EPS) |
| Doors | Sliding Door, Roller Shutter Door, Overhead Door, Cold Storage Door, Fire Door, Security Door |
| Windows | PVC or aluminum alloy |
| Quality inspection | Factory Self-inspection Customer inspection Third party inspection |
| Installation | Construction drawing Installation drawing Remote guidance installation On site installation guidance |
| Other components are available upon request, please provide the detailed for custom design | |
Combined with the high ductility inherent in steel materials, steel structures can absorb and dissipate significant energy through plastic deformation during seismic events. This effectively mitigates the risk of sudden collapse. Moreover, the high strength-to-weight ratio of steel reduces the inertial forces acting on the structure during earthquakes, fundamentally enhancing the building's seismic stability.
A welding robot is an automated industrial machine that performs precise, consistent welds using a programmable robotic arm. It is widely used in manufacturing (e.g., automotive, shipbuilding) for its speed, repeatability, and ability to work in hazardous environments. Key features include multi-axis movement, real-time sensors, and compatibility with various welding processes (MIG, TIG, spot welding). Modern systems often integrate AI, IoT, and collaborative designs for smarter, safer operation.
A: We own manufacturing factories producing steel structures, steel sheets and sandwich panels. You're welcome to visit our factory to discuss your project in detail.
A: Our steel structure products are certified with CE (for compliance with EU safety, health and environmental protection standards) and CWB (Canadian Welding Bureau) certifications, ensuring our products meet international quality and safety requirements.
A: It depends on the order quantity. Generally, the delivery time will be within 25 to 50 days.
A: We have established a complete inspection procedure to check products at all stages of the manufacturing process — including raw materials, in-process materials, verified or tested materials, and finished products.