| Item | Specifications & Details |
|---|---|
| Prefab Homes | Prefab steel structure |
| Steel Structure | Prefab steel structure |
| Wall Panel | 0.326 / 0.376 / 0.426 / 0.476mm THC steel sheet 50 / 75 / 100mm THC EPS / rock wool / glass wool / PU sandwich panel |
| Wall Color | White grey and more (Depending on quantity) |
| Roof | 0.326 / 0.376 / 0.426 / 0.476mm THC steel sheet 50mm THC EPS / rock wool / glass wool / PU sandwich panel |
| Door | 0.326 / 0.376 / 0.426 / 0.476mm THC steel sheet 50mm THC EPS / rock wool / glass wool / PU sandwich panel with lock |
| Window | Aluminum PVC sliding door with security bar |
| Floor | MGO / cement fiber floor board |
| Electricity | Pre-wired with lighting and circuit distributor installed |
| Wind Resistance | Grade 12 Wind, wind speeds |
| Earthquake Resistance | Grade 8 |
| Snow Load Capacity Of Roofing | 0.6kn/m² |
| Live Load Capacity Of Roofing | 0.6kn/m² |
| Wall Permitted Loading | 0.6kn/m² |
Angle head is used to connect and fix the whole frame
Columns are used to support the top weight
Wall panels provide acoustic, thermal, thermal and fire protection
Cement fibreboard for bottom reinforcement and load-bearing support
Standard plastic steel doors, optional aluminum alloy, glass and other materials, and can be customized in size
Standard plastic steel window (single glass), optional aluminum alloy and double glass
The socket can be customized according to customer requirements (US standards, European standards, British standards, German standards, etc.)
Container toilet (various styles, support size customisation)
Floor PVC floor leather (a variety of styles available)
The appearance is standard white, and other colors are supported
When installing, the weather should not be windy. It is best to install the steel base on the first day, and install the wall panels and roof on the second day. As soon as the wall panels start to be installed, the roof must be installed and fixed immediately; otherwise, the components can easily be blown away by strong winds.
Modular design and standardized components can be quickly assembled without a complicated construction process.
Fixed frame and bottom square tube with screws
Installation of wall panels, doors and windows, fastening with screws and then sealing with glue
Installation of floor and top aircraft frame ceiling tiles, screwed and glued for sealing
Complete the installation
Multi-scenario applications: tourism accommodation, office space, earthquake relief, street flash mob, temporary dormitory and other multi-scenario applications.
We are a factory established in 2011, supporting OEM and ODM, providing customized design services.
It depends on the order quantity, usually delivery is within 5-15 days after the order is placed.
The service life of the container house steel frame is 30 years under regular environmental conditions.
We can produce 1000 containers a day.
It depends on the size of the house. Usually, it takes about 3 hours for 2 workers to build a room.
Even if there is a 200km/h hurricane and a magnitude 9 earthquake outside, you can still live in the light steel prefabricated house in complete safety.